Dam repairs

First step, temporarily lower water level by installing 12″ pipe through dam. Hopefully will be able to remove sediment from the other end. ┬áLater on we’ll put the pipe lower and install an elbow, vertical riser and a ‘trash guard’.

20130312-152133.jpg

20130312-152151.jpg